S.N. | PROJECT NAME | LOCATION | CONTRACTOR | WORK | YEAR |
---|---|---|---|---|---|
1 | Phase-shift transformation at the ADST transformer station (400 kV) | UAE | Toshiba Corporation | Fire Stopping | 2024 |
2 | Bahia Substation | UAE | Toshiba Corporation | Fire Stopping | 2023 |
3 | Project Splash, AL Maryal Island, Abu Dhabi | UAE | Al Nasr Contracting Co. LLC | Fire Stopping | 2022 |
4 | Burj Khalifa - Refurbishment | UAE | Burj khalifa LLC / EMAAR | Fire Stopping | 2022 |
5 | The Royal Atlantis Resort & Residences | UAE | Schindler Pars International Ltd / Ssangyong Engineering-BSC | Fire Stopping | 2021 |
6 | Private Office of H.H Sheikh Diab Bin Zayed Al Nahyan | UAE | H.H. Sheidh Dheyab Bin Zayed Bin Sultant Al Nahyan | Fire Stopping | 2021 |
7 | Enchancement and Improvement of Selected Metro Stations-Damac, Dubai Internet City, UAE Exchange | UAE | Al Shafar United for electromechanical Engg.LLC (ASU) | Fire Stopping | 2021 |
8 | Dubai International Airport-DP/INF/100 | UAE | AL Naboodah Contracting Co. LLC | Fire Stopping | 2021 |
9 | Media Zone Project | UAE | Schindler Pars International Ltd | Fire Stopping | 2021 |
10 | Media Zone Development, Yas Island, AUH | UAE | ACC | Fire Stopping | 2020 |
11 | EXPO Route 2020 Metro Rail | UAE | Acciona-Gulermak CWJV & Alstom | Fire Stopping | 2020 |
12 | EXPO 2020 Falcon Pavilion | UAE | Al Futtaim | Fire Stopping | 2020 |
13 | Al Maryah Central Project | UAE | ALEC | Fire Stopping | 2020 |
14 | AL Maryah Island | UAE | Al Nasr Contracting Co. LLC | Fire Stopping | 2020 |
15 | DEWA Substation | UAE | Cable Cure Electro Mechanical Works | Fire Stopping | 2020 |
16 | Khiran Mall | Kuwait | AL Ghanim International Gen Trading & Contracting Co. | Fire Stopping | 2020 |
17 | Burj Khalifa -refurbishment | UAE | Burj khalifa LLC | Fire Stopping | 2019 |
18 | DXB Airport -T3-Upgrade | UAE | Deco Emirates LLC | Fire Stopping | 2019 |
19 | W Hotel & Residences,Palm Jumeriah | UAE | AF Constrcution | Fire Stopping | 2019 |
20 | Departmentof Finance New Building | UAE | ALEMCO | Fire Stopping | 2019 |
21 | Al Maryah Central -AUH | UAE | ALEC FIT OUT | Fire Stopping | 2019 |
22 | EXPO 2020 Thematic Distribution | UAE | Al Shafar United for electromechanical Engg.LLC | Fire Stopping | 2019 |
23 | Abu Dhabi Airport-Midfield Terminal Complex Building Project | UAE | TAV-CCC-Arabtec JV | Fire Stopping | 2019 |
24 | Al Maryah Central -AUH | UAE | Alemco | Fire Stopping | 2019 |
25 | Dubai Terminal 3 enabling work | UAE | ALEC | Fire Stopping | 2019 |
26 | Dubai II-Big Box | UAE | AF Construction | Fire Stopping | 2019 |
27 | Emicool - mIrdiff Hills | UAE | AL Nasr contracting | Fire Stopping | 2019 |
28 | City Centre Al Zahia Project | UAE | CCIC | Fire Stopping | 2018 |
29 | Dubai Arena @ City walk | UAE | ASGC construction LLC | Fire Stopping | 2018 |
30 | Masdar Institute Neighbourhood | UAE | Six Construct | Fire Stopping | 2018 |
31 | EXPO 2020 Conference & Exhibition Centre (CoEx) campus | UAE | Alec | Fire Stopping | 2018 |
32 | Town Square Development Project | UAE | ACC/KIER JV | Fire Stopping | 2018 |
33 | Terminal 1 Improvements | UAE | Al Shafar United | Fire Stopping | 2018 |
34 | EXPO 2020 Thematic District | UAE | HPBS | Fire Stopping | 2018 |
35 | Waldorf Astoria Dubai International Finance centre | UAE | ALEC Fitout | Fire Stopping | 2018 |
36 | Dubai Airport Concourse 4 - Stands & Aprons | UAE | ALEC | Fire Stopping | 2018 |
37 | Clemenceau Medical Center(CMC)on plot #DHC.B.22,Al Jadaf,Dubai | UAE | ACC | Fire Stopping | 2018 |
38 | Concoursd C,B&Terminal 1-BHS Halls C&D | UAE | Al Shafar United for electromechanical Engg.LLC | Fire Stopping | 2018 |
39 | B14512-132/22KV CUP2 Airport Substation | UAE | Electro Mechanical | Fire Stopping | 2018 |
40 | MIXED USE BUILDING AT MANKHOOL,DUBAI on PLOT 317-1080 | UAE | Al Naboodah | Fire Stopping | 2018 |
41 | Al Mas Tower-DMCC | UAE | ALEMCO | Fire Stopping | 2018 |
42 | Concourse C,B & terminal 1- Fire rated durasteel | UAE | ASGC | Fire Stopping | 2018 |
43 | Marina Gate 9-residential Tower | UAE | ALEC | Fire Stopping | 2017 |
44 | Dubai Hills Mall | UAE | ALEC | Fire Stopping | 2017 |
45 | Emirates Hill-Villa E161 | UAE | ALEMCO | Fire Stopping | 2017 |
46 | EXPO 2020 -Thematic Distribution -Mock-up | UAE | Al Futtaim Carillion LLC | Fire Stopping | 2017 |
47 | Abudhabi Souq Market Mall | UAE | Arabian Construction Co. | Fire Stopping | 2017 |
48 | Neighbourhood One residence -Masdar City -Abudhabi ,UAE | UAE | Multiplex Middle east | Fire Stopping | 2017 |
49 | Neighbourhood One residence -Masdar City -Abudhabi ,UAE | UAE | Thyssenkrupp Elevator UAE LLC | Fire Stopping | 2017 |
50 | Dubai World Central | UAE | Cloisall CO. L.L.C | Fire Stopping | 2017 |
51 | Al Jafillia Rova Hotel Project | UAE | Shapporji | Fire Stopping | 2017 |
52 | EKFC Short Term Expansion | UAE | Envac Dubai LLC | Fire Stopping | 2017 |
53 | New York University Project | UAE | Zener Steward | Fire Stopping | 2017 |
54 | Abu Dhabi Airport-Midfield Terminal Complex Building-Corewall Shaft Lining Scope | UAE | TAV-CCC-Arabtec JV | Fire Stopping | 2016 |
55 | Al Maktoum International Airport project | UAE | ALEC | Fire Stopping | 2016 |
56 | Dnata Line Maintenance,Dubai International Airport Expansion | UAE | ALEC | Fire Stopping | 2016 |
57 | Memorial Park project | UAE | ALEC | Fire Stopping | 2016 |
58 | T1-Segregation (Phase-2) | UAE | ALEC | Fire Stopping | 2016 |
59 | Holiday Inn Hotel @ Dubai Festival City | UAE | ALEC | Fire Stopping | 2016 |
60 | Dubai International Airport project | UAE | Al Rostamani | Fire Stopping | 2016 |
61 | W Hotel & Residences,Palm Jumeriah | UAE | Drake & Scull | Fire Stopping | 2016 |
62 | Mediclinic -Mediclinic City Hospital North wing | UAE | Kele Contracting | Fire Stopping | 2016 |
63 | Neighbourhood One residence -Masdar City -Abudhabi ,UAE | UAE | Plafond | Fire Stopping | 2016 |
64 | Abu Dhabi International Airport-Midfield Terminal Building - Durasteel board | UAE | Cloisall CO. L.L.C | Fire Stopping | 2016 |
65 | Abu Dhabi International Airport-Midfield terminal Building - Fire rated duct | UAE | Cloisall CO. L.L.C | Fire Stopping | 2015 |
66 | THE DEVELOPMENT OF SOUTH SHAMKHA | UAE | China State Construction Eng. Corp | Fire Stopping | 2015 |
67 | Contract REF#CC026- New York University-Saadiyat Island-AUH | UAE | AL Futtaim Carrillion | Fire Stopping | 2015 |
68 | Toyota 3S Wave Al FUTTAIM,Mussafah | UAE | Al Futtaim | Fire Stopping | 2015 |
69 | Madinat Jumeirah Phase 4 development, Dubai | UAE | Al Futtaim Carrillion | Fire Stopping | 2015 |
70 | Four Season Hotel ,Maryah Island , Abudhabi | UAE | Al Futtaim Carrillion | Fire Stopping | 2015 |
71 | Dubai Festival City - Project Salsa2 | UAE | ALEC | Fire Stopping | 2015 |
72 | REEL CINEMA CITY WALK | UAE | ALEC | Fire Stopping | 2015 |
73 | Jebel Ali School | UAE | ALEC | Fire Stopping | 2015 |
74 | Dubai International Airport Expansion(PhaseIII) | UAE | ALEC | Fire Stopping | 2015 |
75 | EKFC 3,Long terms Expansion | UAE | Habtoor Leighton Group | Fire Stopping | 2015 |
76 | Manazel Al Khor | UAE | Sun Engineering | Fire Stopping | 2015 |
77 | Yas Mall | UAE | Khansaheb | Fire Stopping | 2015 |
78 | Cargo Facilities at Dubai International Airport | UAE | ALEC | Fire Stopping | 2014 |
79 | EKFC Short Term Expansion | UAE | Transgulf | Fire Stopping | 2014 |
80 | Premier Inn-AUH | UAE | BAM International | Fire Stopping | 2013 |
81 | Al Ain Stadium Project | UAE | BAM International | Fire Stopping | 2013 |
82 | FGB Arena | UAE | Brayan Group | Fire Stopping | 2013 |
83 | JBR cinema | UAE | ALEC | Fire Stopping | 2013 |
84 | Al Sufouh Transit System | UAE | Al Futtaim Engineering | Fire Stopping | 2013 |
85 | Terminal 1 Arrivals Hall & Tunnel construction CBC130 | UAE | ALEC | Fire Stopping | 2012 |
86 | Concourse IV-SP-500-Dubai Airport-PHASE3 | UAE | ALEC | Fire Stopping | 2012 |
87 | J-123,Construction of G+1,Multipurpose Hall for M/s.Arab Unity School on Plt No.262-590,AL Mezhar first,Dubai | UAE | Aroma International Bldg. Cont. LLC | Fire Stopping | 2012 |
88 | ADNIC @ Al Watani | UAE | Electro Mechanical | Fire Stopping | 2012 |
89 | Qamardeen Hotel-refurbishment -CFC126 | UAE | ALEC | Fire Stopping | 2012 |
90 | Dubai Metro Project- Jebel Ali Depot & Rashidiya Depot | UAE | JT METRO JV | Fire Stopping | 2012 |
91 | Contract REF#CC026- New York University-Saadiyat Island-AUH(WP4807 PACKAGE) | UAE | Al Futtaim Carrillion | Fire Stopping | 2012 |
92 | Jumeirah Beach Hotel | UAE | Al Tamimi | Fire Stopping | 2012 |
93 | Palazzo Versace Hotel | UAE | Mac Air LLC | Fire Stopping | 2012 |
94 | Sowwah Island Substation | UAE | Drake & Scull | Fire Stopping | 2012 |
95 | Abu Dhabi Financial Centre (SOWWAH Square -Galleria Area) | UAE | JC Maclean | Fire Stopping | 2012 |
96 | Abudhabi Financial Centre- Retail Project | UAE | OGER Abu Dhabi | Fire Stopping | 2012 |
97 | Abu Dhabi Airport-Midfield Terminal Complex Building-CBC123 | UAE | ALEC | Fire Stopping | 2012 |
98 | AX466-Dubai International Airport Terminal 2 Expansion Project | UAE | EFECO | Fire Stopping | 2012 |
99 | Office Annex Security Equipment Room-Builders Work REV-02 | UAE | Bilt Middle East LLC | Fire Stopping | 2012 |
100 | Qusahwira Field development Project-ADCO Project#P 14364 | UAE | Consolidated Contractors | Fire Stopping | 2012 |
101 | Jebel Ali Hotel Extension | UAE | BK Gulf | Fire Stopping | 2012 |
102 | Relocated of Airport EXPO & Related Facilities to Dubai World Central | UAE | ALEC | Fire Stopping | 2012 |
103 | 132KV & 400KV GIS Fujairah | UAE | Toshiba Corporation | Fire Stopping | 2012 |
104 | Water Park @ Yas Island | UAE | Voltas Ltd. | Fire Stopping | 2011 |
105 | 20KV Switchgear Modification @ Madinat Zayed for Shams Solar Power Plant Integration | UAE | Toshiba Corporation | Fire Stopping | 2011 |
106 | Dubai Internation Airport -Expansion (Phase II)-AX 132-Automated People Movers | UAE | Mitsubishi Corporation | Fire Stopping | 2011 |
107 | Hilton Dubai,Jumeirah | UAE | Al Tamimi | Fire Stopping | 2011 |
108 | Jumeirah Beach Hotel Refurb -Phase I(Project Ref#CFC112) | UAE | ALEC | Fire Stopping | 2011 |
109 | Water Park @ Yas Island-Contract Ref:CBC102/00763 | UAE | ALEC | Fire Stopping | 2011 |
110 | 22 Substation @ Saadiyat Island | UAE | Hilalco | Fire Stopping | 2011 |
111 | EKFC Dubai | UAE | United Masters Electromechanical LLC | Fire Stopping | 2011 |
112 | Dubai International Airport Expansion Phase II - AX 124 -Structure,SAS,Finishes ,Signage & External Envelope for Concourse 3 | UAE | Altamimi Engineering | Fire Stopping | 2011 |
113 | Abu Dhabi Police General Head Quarters-P029 - Fire Rated Duct | UAE | Emirates Electromechanical | Fire Stopping | 2011 |
114 | Al Zeina Project-Al Raha Beach - Fire Rated Duct | UAE | BK Gulf LLC | Fire Stopping | 2011 |
115 | Construction of Al Qassimi Maternity Hospital & Emergency Extension @ Sharjah ,UAE for Ministry of Public | UAE | Ali Moosa & Sons | Fire Stopping | 2011 |
116 | Cleveland Clinic | UAE | Al Reyami | Fire Stopping | 2010 |
117 | Habshan-BAB-Power Station | UAE | Electro Mechanical | Fire Stopping | 2010 |
118 | Sowah Island Development -Pump Stations | UAE | Al Naboodah Contracting | Fire Stopping | 2010 |
119 | AL Ghurair City Expansion (Phase II) | UAE | ETA | Fire Stopping | 2010 |
120 | 344 Villas @ Sadiyath Island Beach - | UAE | Al Jaber Energy Services | Fire Stopping | 2010 |
121 | CFC075,02-Dubai Internation Airport(C2-T3,Fit-out) -Royal Airwing | UAE | ALEC | Fire Stopping | 2010 |
122 | St. Regis Resort | UAE | BK Gulf | Fire Stopping | 2010 |
123 | Abu Dhabi Investment council New Headquarters - Fire Ducting | UAE | ALKO Air Conditioning | Fire Stopping | 2010 |
124 | Cleveland Clinic | UAE | Six Construct-Samsung JV | Fire Stopping | 2010 |
125 | CFC075,02-Dubai Internation Airport(C2-T3,Fit-out) -Royal Airwing | UAE | ALEC | Fire Stopping | 2010 |
126 | Cleveland Clinic | UAE | ALEC | Fire Stopping | 2010 |
127 | Cleveland Clinic | UAE | Mivan-Depa | Fire Stopping | 2010 |
128 | Mangrove Place project | UAE | GTCC | Fire Stopping | 2010 |
129 | Millennium Gold Resort,Al Ain - Fire Ducting | UAE | Verger et Delporte | Fire Stopping | 2010 |
130 | Abudhabi Golf Club Hotel | UAE | Brookfield Multiplex | Fire Stopping | 2010 |
131 | QUSAHWIRA Phase I Development-Building Services - | UAE | Toshiba | Fire Stopping | 2010 |
132 | Burj Dubai Development - Substations | UAE | AL Futtaim Carillion | Fire Stopping | 2010 |
133 | Proposed Development and construction of the Meydan Business Park- Nad Al Sheba ,Dubai | UAE | Mammut Contracting LLC | Fire Stopping | 2010 |
134 | Park Hyatt Hotel Beach Resort & Hotel | UAE | ALEC | Fire Stopping | 2010 |
135 | Saadiyat Al Manara | UAE | ALEC | Fire Stopping | 2010 |
136 | Abu Dhabi Investment council New Headquarters | UAE | AL Futtaim Carillion | Fire Stopping | 2009 |
137 | Palm Jumeirah,Royal Mirage III | UAE | ALEC | Fire Stopping | 2009 |
138 | Emirati Housing Community-YAS Island-Phase-I | UAE | CAT Group | Fire Stopping | 2009 |
139 | Emirates Staff Housing,Dubai Land near Barari Area(G+10)5 Buildings | UAE | Buhaleeba Contracting | Fire Stopping | 2009 |
140 | Abu Dhabi Financial Center | UAE | Thermo LLC | Fire Stopping | 2009 |
141 | Abu Dhabi Investment Council - Fire Rated Duct Coating | UAE | PT Gulf | Fire Stopping | 2009 |
142 | Sowwah Square Project,Abu Dhabi | UAE | OGER Abu Dhabi | Fire Stopping | 2009 |
143 | Dubai International Airport Concourse 3 & Automated People Movers | UAE | ALEC / Fujita | Fire Stopping | 2009 |
144 | Dubai Airport Package AX 124 - Structure SAS,Finishes & Signage | UAE | ALEC | Fire Stopping | 2009 |
145 | Al Mizhar Health Centre - Fire Rated Duct | UAE | Parkway International | Fire Stopping | 2009 |
146 | Green Line G 19 - Fire Rated Ceiling | UAE | JT Metro JV | Fire Stopping | 2009 |
147 | Nad Al Hamar Project - Fire Rated Duct | UAE | Bin Dasmal Airconditioning | Fire Stopping | 2009 |
148 | Burj Lofts | UAE | Al Futtaim Carillion | Fire Stopping | 2009 |
149 | Masdar Institute of Science Technology | UAE | Al Ahmadiah-Hip-Hing JV | Fire Stopping | 2009 |
150 | Dubai Metro Project Bujuman Station - Fire Rated Access Panels | UAE | Lindner Depa Interirors | Fire Stopping | 2009 |
151 | Dubai Metro Project Jumeirah Island Car Park | UAE | Ali Moosa and Sons Cont. | Fire Stopping | 2009 |
152 | Dubai Metro Project - Red Line R06 - Fire Rated Ceiling | UAE | JT Metro JV | Fire Stopping | 2009 |
153 | Dubai Metro Project- Jebel Ali Depots,Dubai | UAE | JT Metro JV | Fire Stopping | 2008 |
154 | Hiton Hotel Project,Ras Al Khaimah | UAE | Emirates-EMI | Fire Stopping | 2008 |
155 | 2B+G+7 Typical Floors at Dubai Marina,Dubai | UAE | Ashtaar Interior Design & | Fire Stopping | 2008 |
156 | Indigo Tower at Jumeirah Lake Towers,Dubai | UAE | Al Rostamani Pegel | Fire Stopping | 2008 |
157 | Burj Dubai at Businessbay,Dubai | UAE | Samsung-Besix- Arabtec JV | Fire Stopping | 2008 |
158 | Atlantis The Palm,Jumeirah,Dubai | UAE | BK Gulf-Rotary JV | Fire Stopping | 2008 |
159 | DMCC Al Mas Tower,JLT Dubai | UAE | Taisei - ACC | Fire Stopping | 2008 |
160 | Burj Dubai,The Burj Tower,Dubai | UAE | Schmidlin/Arabian | Fire Stopping | 2008 |
161 | Index Building- DIFC,Dubai | UAE | BK Gulf | Fire Stopping | 2008 |
162 | Burj Dubai Development -The Burj Tower -Package No.BD-07 | UAE | Depa Interiors | Fire Stopping | 2008 |
163 | 5 Star Hotel and Mixed use Tower & Car Parks on Sheikh Zayed Road,Dubai | UAE | Hastie International Pty Ltd. | Fire Stopping | 2008 |
164 | Dubai Festival City-Repair 1 Level Parking,Dubai | UAE | Hyperpanda | Fire Stopping | 2008 |
165 | Dubai International Financial Centers (DIFC) | UAE | Turner International | Fire Stopping | 2008 |
166 | Dubai metro Project - Union Square Underground Station - Fire Rated Demountable Access Panels | UAE | JT Metro JV | Fire Stopping | 2008 |
167 | Dubai Metro Project - 9 Redline OverGround Stations - Supply and Installation of Fire Rated Access Panels | UAE | JT Metro JV | Fire Stopping | 2008 |
168 | Royal Spa - Nad AL Sheba,Dubai | UAE | ZSML Construction | Fire Stopping | 2008 |
169 | Downtown Jebel Ali Project (Parcel 21B2 Bldg. Mx01-04) | UAE | Taisei Corporation | Fire Stopping | 2008 |
170 | 3B+G+6 Storey Office Bldg for OMD -Dubai Media City (Green Bldg.) | UAE | KAD Airconditioning | Fire Stopping | 2008 |
171 | Ritz Carlton Hotels @ DIFC | UAE | Target - Bouygues JV | Fire Stopping | 2008 |
172 | Jumeirah Golf Estate Club & Jumeirah Tennis Academy | UAE | Bin Dasmal Airconditioning | Fire Stopping | 2008 |
173 | Ritz Carlton Hotels @ DIFC | UAE | ETDE - VERGER JV | Fire Stopping | 2008 |
174 | Crowne Plaza - Yas Island | UAE | PT Gulf Abu Dhabi | Fire Stopping | 2008 |
175 | Crowne Plaza - Yas Island | UAE | InterBeton Abu Dhabi LLC | Fire Stopping | 2008 |
176 | Mirdif City Center - Dubai | UAE | ALEC | Fire Stopping | 2008 |
177 | Rixxos Ottoman Hotels & Resort - Palm Jumeirah Left Crescent | UAE | ZSML Construction | Fire Stopping | 2008 |
178 | Dubai Metro Project- Underground Stations 4 Nos. | UAE | Prime Technologies | Fire Stopping | 2008 |
179 | Burj Dubai-Development | UAE | Al Abbar | Fire Stopping | 2008 |
180 | Dubai Maritime City,Deira Dubai | UAE | Arabtec Construction | Fire Stopping | 2008 |
181 | Samaya Hotels & Resort Projects - Dubai Creek | UAE | Samaya | Fire Stopping | 2008 |
182 | Burj Dubai Development -The Burj Tower -Package No.BD-07 | UAE | Fino International | Fire Stopping | 2008 |
183 | Replacement of New Fire Exit Doors,Renewal and additional and replacement of Internal Corridor Fire Doors- Al Corniche Hospital- AUH | UAE | Mazroui Supplies,Contract & Maintenance Est. | Fire Stopping | 2008 |
184 | Media One,Media City,Dubai | UAE | ALEC | Fire Stopping | 2007 |
185 | The IKEA,Dubai Festival City | UAE | Higgs & Hill | Fire Stopping | 2007 |
186 | 2B + G + 3 Office Building (PE-099) Johnson & Johnson HQ At Health Care City,Dubai | UAE | Condor Building Contracting | Fire Stopping | 2007 |
187 | Burj Dubai Development Old Town Commercial Island,Dubai | UAE | Al Naboodah Laing O - Rouke | Fire Stopping | 2007 |
188 | The Lake Terrace Tower at Jumeirah Lakes Towers | UAE | Al Arrab Electromechanical | Fire Stopping | 2007 |
189 | Restaurant at Burj Al Arab | UAE | Green Line Interiors | Fire Stopping | 2007 |
190 | The World Trade Center Apartments | UAE | Dubai Contracting Co. | Fire Stopping | 2007 |
191 | Al Mas Tower - Dubai Metal Commodities Co. at JLT Dubai | UAE | Taisei - ACC JV | Fire Stopping | 2007 |
192 | The Dubai Mall | UAE | CPD Middle East | Fire Stopping | 2007 |
193 | Between the Bridges Resort Development- Abu Dhabi | UAE | ALEC | Fire Stopping | 2007 |
194 | Sabah Tower at Jumeirah Lakes Tower | UAE | REMCO | Fire Stopping | 2007 |
195 | Concorde Tower at Jumeirah Lakes Towers - Dubai | UAE | Al Rostamani Pegel | Fire Stopping | 2007 |
196 | Dubai Marina Mall Hotel & Apartments | UAE | ALEC | Fire Stopping | 2007 |
197 | Atlantis Hotel & Royal Tower at Palm Jumeirah Crescent | UAE | ACMT / BKG-ROTARY Jv | Fire Stopping | 2007 |
198 | The Jewels Twin Towers - Dubai Marina | UAE | Drake & Scull International | Fire Stopping | 2007 |
199 | Between the Bridges Resort Development - Abu Dhabi | UAE | Drake & Scull International | Fire Stopping | 2007 |
200 | Marina Mansion - Dubai Marina | UAE | Drake & Scull International | Fire Stopping | 2007 |
201 | Mubadak ERDWA Bldg. at Sector 25 - Abu Dhabi | UAE | CCC | Fire Stopping | 2007 |
202 | Dubai International Financial Center Gate Precincts | UAE | Turner Construction Co. | Fire Stopping | 2007 |
203 | Indigo Tower at Jumeirah Lake Towers | UAE | Drake & Scull International | Fire Stopping | 2006 |
204 | Media One at Media City | UAE | Al Jaber Grinaker LTA | Fire Stopping | 2006 |
205 | Residential Building at AL Barsha First | UAE | China Railway 18Th Bureau B.G. | Fire Stopping | 2006 |
206 | Old Town Commercial Island - Burj Site Development | UAE | AL Naboodah Laing O Rourke | Fire Stopping | 2006 |
207 | AX 431 DIA Terminal Expansion Phase II | UAE | Al Habtoor Murray & Roberts | Fire Stopping | 2006 |
208 | Discovery Gardens at Sheikh Zayed Road Interchange 5 | UAE | Al Huda Contracting | Fire Stopping | 2006 |
209 | Jumeirah Beach Residence Project- Sector 1 & 3 | UAE | Arabtec Construction | Fire Stopping | 2006 |
210 | Bab AL Shams- Golf Club at Dubai Festival City | UAE | Khansaheb Civil Engg. | Fire Stopping | 2006 |
211 | Mall of the Emirates,Sheikh Zayed Road Interchange 4 | UAE | Voltas Limited | Fire Stopping | 2006 |
212 | AX 237 - Dubai International Airport | UAE | EEMI | Fire Stopping | 2006 |
213 | Park Place Tower,Trade Centre 1 Sheikh Zayed Road | UAE | Drake & Scull | Fire Stopping | 2005 |
214 | Burj Dubai Development -Old Town Development Sites A & B ,Site A Phase 2 | UAE | Al Jaber ALEC | Fire Stopping | 2005 |
215 | ADNOC Group Companies New Headquarters | UAE | ETA | Fire Stopping | 2005 |
216 | Mall of the Emirates,Sheikh Zayed Road Interchange 4 | UAE | Al Jaber ALEC | Fire Stopping | 2005 |
217 | Al Rostamani Towers,Dubai Marina | UAE | Al Rostamani Pegal | Fire Stopping | 2005 |
218 | IBN BATUTA -Garden City Mall | UAE | ETA | Fire Stopping | 2005 |
219 | Dubai Creek Golf & Yacht Club - Five Star Hotel Project Dubai/UAE | UAE | Bu Haleeba | Fire Stopping | 2004 |
220 | Endurance City Desert Hotel - Al Ain/UAE | UAE | Transgulf | Fire Stopping | 2004 |
221 | BHV Shopping Mall | UAE | EPICO | Fire Stopping | 2004 |
222 | Dar Al Nahar | UAE | Dar Al Handasa | Fire Stopping | 2004 |
223 | Etisalat H.O. Building Dubai / UAE | UAE | Six Construct,Belgium | Fire Stopping | 1991 |
224 | Eastern Province International Airport (KFIA) | Nigeria | Samsung,Korea | Fire Stopping | 1990 |